● VOTE SCHEDULED · TUE NOV 24 · 6 PM

If it computes
like a data center…

Surfside Beach Town Council is about to annex land for a facility full of servers, cooling loops and backup generators, and the town hasn’t formally classified what it is. Delay the vote.

Tell Council: Delay   See the scale
--days
--hrs
--min
--sec
The short version

Annex first, classify later. That’s backwards.

Prime Storage’s sister company, Edge Inference, wants to convert 20,000–25,000 sq ft of the storage building at 610 US-17 BUS into what it calls an “inference point.” The Town’s own FAQ says the only item before Council now is annexing 2.3 acres into the town. But the same FAQ says the Planning Director decides what the use is only after annexation.

Council would be voting on the land before anyone has formally decided what is going on it.

All we’re asking: pause, get it in writing, then decide.

Scale

“Small” depends on where you plug it in.

Yes, hyperscale campuses draw 100 to 1,000 MW, and that’s the comparison the FAQ leans on. But Surfside Beach is a small beach town, not Northern Virginia. The right yardstick is the town’s own grid, not Google’s.

Edge Inference, start
2.5 MW
Edge Inference, “cap”
20 MW
Large data center (low)
100 MW
Large data center (high)
1,000 MW

Bars on a log scale. Figures from the Town’s FAQ dated Nov. 13, 2026.

Translate it into homes

At an average continuous draw of about 1.2 kW per American home (a rough rule of thumb), each square below is ~100 homes.

2.5 MW ≈ 2,000 homes20 MW ≈ 16,000 homes

The cap is 8× the starting load, and 16,000 homes’ worth of electricity is far more than a town of a few thousand residents uses. All of it would sit behind a Waffle House on Highway 17 Business, beside homes and the town’s main commercial corridor.

The label

Why this is a data center.

THE FAQ SAYS
“Not a data center.”
  • Doesn’t “store” data
  • Goes inside an existing building
  • Works “like a telephone exchange”
THE SAME FAQ ALSO DESCRIBES
A data center.
  • Racks of compute, 24/7, at 2.5–20 MW
  • A closed-loop liquid cooling system
  • Backup generators and fire/electrical review
  • Part of a national network of “edge” sites
01

“Doesn’t store data” isn’t the test

A data center is a building of servers doing computation. Processing instead of archiving doesn’t change the power, cooling, generators or footprint.

02

“Telephone exchange” is branding

An exchange doesn’t need a sealed coolant loop sized to last 30 years or a multi-megawatt power upgrade.

03

It’s one of hundreds

Local reporting on the company’s Virginia proposal says its network could reach over 3,500 MW across 347 sites in 33 states. Surfside could be one node in that.

04

Promises aren’t ordinances

The 20 MW cap and no-water pledge appear in an FAQ. Council hasn’t said they’ll be enforceable conditions of annexation or zoning.

05

Your own use classification is pending

The FAQ says Edge will ask the Planning Director to classify the use after annexation. Council should know the answer first.

06

The upside is unproven

Claims about 911 and hospital benefits are general. No agreements with Surfside Beach’s emergency services are cited.

Follow the money

The shell is for someone else.

In April 2026, Prime Group Holdings, the parent of Prime Storage, announced a nationwide rollout of “edge data centers” and battery storage at its self-storage properties, in collaboration with Microsoft and Hanwha. Microsoft’s cloud executive was quoted in the announcement saying the project shows how Microsoft Azure can support real-time AI at the edge.

Prime’s own press materials say “edge data centers.” Only the Surfside FAQ says it isn’t one.
THE MODEL

Powered shells

Prime says its edge is leveraging existing power capacity for a faster “time-to-power.” In industry terms, that’s a building with power and cooling ready for a tenant’s hardware. It appears the tenant could be a hyperscaler, not a local 911 center.

THE PRECEDENT

Marietta, GA: 18 MW

A data-center directory lists a planned 18 MW Prime Storage conversion there, with demolished storage units to make room for support infrastructure. Surfside’s “never above 20 MW” isn’t far off.

THE PITCH

“Inference point”

Local officials elsewhere are being given the same term. Virginia coverage notes it is, by definition, a data center that runs trained AI models.

Sources: Business Wire (Prime Group, Apr. 21, 2026); Data Center Dynamics; Blackridge Research; WHRO/WVTF; datacentermap.com. Whether Azure workloads would run in Surfside has not been stated publicly. We’re asking Council to ask.

Reality check

What “up to 20 MW” really means.

NOISE

Hard to measure, easy to hear

Cooling plant and generators produce low-frequency hum that carries through walls and ground. The FAQ’s limits are decibel readings at the property line, but low-frequency noise barely registers on a standard dB(A) meter. Who will test it, how often, and who pays?

GENERATORS

Testing is routine

The FAQ admits backup generators run for “short routine maintenance tests.” Backup capacity for a load this size is industrial-scale equipment next to homes, and it runs regularly, not only in outages.

POWER

“No rate hike” isn’t “no impact”

Even if the project pays for its own upgrades, 20 MW running around the clock is real generation somewhere. Santee Cooper’s mix includes coal and natural gas, so new constant load means more fuel burned. That’s not a bill line item, but it is a cost to the air we breathe on the coast.

MONEY

Possibly $200–500 million

Rule-of-thumb industry build costs run on the order of $10M+ per MW before chips. At 20 MW, that’s hundreds of millions at stake. Our estimate, not Prime’s figure. That’s the scale of legal firepower on the other side.

Low-frequency noiseGenerator emissionsGrid loadHurricane riskCoolant loop
David vs. Goliath

A small town vs. a very large legal team.

A 2.3-acre annexation is a modest petition. The project behind it may be anything but. Prime and its partners can field land-use counsel and engineers who do this daily across 30+ states. A town of a few thousand cannot match that on its own, and verbal assurances in an FAQ won’t help once the land is annexed and the rezoning approved.

So before the vote: hire independent land-use counsel and a qualified acoustical engineer for the Town; require a written development agreement with an enforceable MW cap, noise testing (including low-frequency), generator hour limits, emissions reporting, decommissioning and removal terms, and penalties paid by the company, not residents. If they mean what the FAQ says, they’ll sign it.

Where we are

The timeline

Sept. 3Prime Storage files the annexation petition.
Oct. 6Planning Commission hearing; recommends C-1 zoning.
Oct. 27Council passes first reading unanimously.
Nov. 10Residents pack council chambers over the proposal, per local TV news.
Tue Nov. 24 · 6:00 PM · Dick M. Johnson Civic Center, 829 Pine Dr.Second reading and potential final vote, expected as the first agenda item.
What we’re asking

Six asks. All reasonable.

  1. Delay the Nov. 24 second reading. Nothing is lost by getting this right.
  2. Get the use classified in writing first, with Edge’s full description of power, cooling, generators, staffing and traffic made public before any vote.
  3. Hold a public hearing on the actual use, not only the 2.3-acre boundary line.
  4. Commission independent review of electrical load, noise, fire safety, hurricane/flood risk and utility impacts.
  5. Retain independent counsel and an acoustical engineer for the Town, paid for by the applicant.
  6. Make every promise binding: MW cap, no municipal water, no new structures, generator hours and noise limits written into ordinance or development agreement.
Take 2 minutes

Send it to Council.

Edit this note, copy it, and send it to the Mayor and Council. You can also call Planning & Zoning at (843) 839-3769 or speak at the Nov. 24 meeting.

Email everyone at once

Council & Town contacts

Click a name to email just that person. Please be polite and specific; it works better.